Provisional relief
The term ‘provisional relief’, also known as ‘provisional remedy’ and ‘interim remedy’, refers to preliminary injunctions that are issued by a court while an arbitration proceeding is pending.
Arbitration is a private, contractual form of dispute resolution, which provides for the determination of disputes by a third party arbitrator or arbitration panel or tribunal.
The aim of provisional relief is to preserve the ‘status quo’, i.e. the position between the parties, and ensure the effectiveness of an arbitration award pending the outcome of a dispute resolution. The court can order relief if a party establishes that any arbitration award made in its favour would be rendered ineffectual without such relief.
A common form of provisional relief is an order to ‘preserve assets’ that are in dispute. For example, a court or tribunal might restrain a sale of the property that is the subject of the dispute, such as a building. Relief can also be granted to one party for the non-performance of the other party as a result of the dispute.
Provisional measures are said to be ‘conservative’ in nature, as they are intended to preserve the effectiveness of the arbitration process, as opposed to awarding one party an advance of the relief they seek from the dispute resolution process. As such, it is unlikely that provisional relief will be granted where it would materially prejudice or disadvantage the other party.
According to section 39 of the Arbitration Act, the parties are free to agree that the tribunal will have the power to order any relief that it would have the power to grant as a final award on a provisional basis as relief to one or other party.
The granting of provisional relief will often depend on:
- The parties’ agreement set out in the arbitration clause in the contract.
- Whether the parties have adopted the provisions of any institutional rules of arbitration.
- The jurisdiction in which the arbitration will take place, as this might limit or prescribe the tribunal’s powers.
The Arbitration Act states that, unless otherwise agreed by the parties, the tribunal has the power to order as provisional relief:
- A declaration on any matter.
- A sum of money.
- A party to do or refrain from doing anything.
- Specific performance of a contract.
- The rectifying, setting aside or cancelling of a deed or other document.
- Simple or compound interest from any date considered appropriate.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Alternative dispute resolution.
- Arbitration.
- Arbitration Act.
- Causes of construction disputes.
- Construction Industry Model Arbitration Rules CIMAR.
- Dispute resolution boards.
- Payment notice.
- Pendulum arbitration.
- Remedies for late payment.
[edit] External resources
- Practical Law - Arbitration
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February